Configure and synchronize an asset type for GIS

Performing a GIS asset sync consists of the following steps:

  1. For each asset type to be synchronized with GIS, configure the GIS service, layer, and ID mapping information. Optionally specify additional GIS attribute mapping if you want to synchronize additional GIS attributes.

  2. For each asset type to be synchronized, submit a GIS asset sync either manually or through a batch job at regular intervals.